DRAM Supply Tightness: EUV Capacity, Reballed Memory and Copper Foil
Rising DRAM costs are reaching beyond contract prices. A November 11 Chinese industry roundup covered a race for ASML EUV delivery slots, a planned doubling of HVLP4 copper foil capacity, wider use of reballed memory in entry-level smartphones, and Google’s newest HBM-equipped TPU systems. Key figures were checked against company disclosures; single-source items remain attributed.
Key takeaways
- ASML said on October 14 that planned 2027 and 2028 supply will not fully meet customer demand, and is reviewing further 2028 capacity.
- TrendForce estimates reballed memory penetration in smartphones at 3–4% in 2026, potentially 7–9% in 2027.
- Furukawa Electric plans to roughly double HVLP4 copper foil supply capacity by end-FY2029 versus end-FY2026.
- Google added two eighth-generation TPU systems; the 8i Max doubles HBM bandwidth to 17.2 TB/s and raises capacity 33% to 384 GB.
- Omdia’s Ben Caddy predicted that by 2030, 35% of hardware sold through the EMEA channel will be taken back by partners.
Samsung and SK hynix move early on ASML delivery slots
TrendForce reported on November 10, citing Korean outlet Solution News and unnamed sources, that Samsung Electronics and SK hynix are each seeking EUV systems worth roughly KRW 10–20 trillion for 2027–2028 delivery slots — a source-based estimate, not a disclosed order. The documented portion is narrower: SK hynix’s disclosed KRW 11.95 trillion EUV purchase is due by December 31, 2027 for its 1c DRAM transition, and Samsung’s first Pyeongtaek P5 fab is targeted for 2028.
ASML’s results set the context. Q2 2026 put 2026 low-NA EUV capacity at around 65 units, with a planned 30% increase for 2027 and a further 30% for 2028 under investigation. In Q3 results on October 14, CEO Christophe Fouquet said planned supply for both years “will not fully meet the demand of our customers” and that ASML is now investigating 2028 capacity beyond that 30%. Lead times are reportedly doubled, and backlogs at Hanmi Semiconductor and Amkor run two to three years, including HBM TC bonders.
For buyers, tool availability — not budget alone — sets the timing of advanced DRAM and HBM capacity. How much of the contemplated 2028 increase ASML can deliver remains unresolved.
Furukawa Electric plans to roughly double HVLP4 copper foil capacity
Furukawa Electric said on November 9 it will expand supply capacity for F0X-WS, its HVLP4-grade copper foil for high-frequency AI-server boards. The phased expansion covers its Imaichi site in Nikko City, Tochigi Prefecture, Japan, and two group subsidiaries in Douliu, Yunlin County, Taiwan, China, targeting roughly twice the end-FY2026 level by end-FY2029.
Demand still exceeds supply despite efficiency gains, the company said; it will raise the share of high-value-added products and prepare next-generation HVLP5 foil. HVLP foil minimises high-frequency transmission loss in AI server and optical-module boards.
This is an upstream materials signal, not a DRAM supply change: substrate tightness can constrain AI server build-out alongside memory. No tonnage, capex figure or interim milestone was disclosed, so the pace of capacity release cannot be quantified.
Reused hardware and reballed memory gain ground as DRAM costs rise
At the Canalys Forums in Barcelona, Omdia senior analyst Ben Caddy predicted that by 2030, 35% of hardware sold through the EMEA channel will be taken back by partners and their ITAD providers, according to Computer Weekly and The Register. This is a take-back rate for EMEA channel hardware, not the refurbished share of hardware sales. The Register reported on November 9 that memory costs have more than quadrupled this year as manufacturers prioritise HBM, with up-to-three-year warranties making refurbished kit more acceptable; suppliers named returned-device availability, buyer trust and missing verification standards as constraints.
At component level, TrendForce said on November 6 that reballed memory — dies recovered from used devices and re-soldered — will reach about 3–4% penetration in the smartphone market in 2026 and potentially 7–9% in 2027. Supply is concentrated in 4GB LPDDR4X parts, mainly in 4G phones below CNY 1,299, and mobile DRAM contract price increases are expected to gain momentum in Q1 2027. TrendForce flags quality-consistency and warranty-cost risks, and says reballed memory’s share of smartphone LPDRAM bit consumption will stay modest — a cost-management option with reliability trade-offs, not a supply-side offset.
Google extends its eighth-generation TPU line with two systems
According to Futurum Group’s coverage of Google Cloud’s November 9 webcast, Google added two systems to its eighth-generation TPU family, bringing it to four within 2026 after the 8t and 8i systems introduced earlier in the year. These are system-level configurations on existing silicon, not new tape-outs.
TPU 8tx pairs 8t silicon with 5th Gen AMD EPYC host CPUs providing PCIe link encryption, cryptographic attestation and secure memory enclaves; Google targets regulated enterprises and governments. TPU 8i Max packages two 8i dies, doubling compute, on-chip SRAM and HBM bandwidth to 17.2 TB/s while raising HBM capacity 33% to 384 GB in the same rack footprint.
For memory buyers the signal is rising per-package HBM content and bandwidth. These are Google-internal systems, so the launch does not change merchant DRAM or HBM availability; no general availability date was given, so no delivery assumption should be attached.
Legacy GPU pricing offers a narrow demand-side signal
GameGPU reported the GeForce RTX 3060 12GB quoted at US$610 (roughly 76,500 BDT) in some developing markets including Bangladesh, while the faster-in-gaming RTX 3060 Ti 8GB was about half that. GameGPU attributes the gap to dwindling older-card stock and demand for larger local memory buffers, calculates the quote at almost 85% above the US$329 launch price, and links 12GB of VRAM to entry-level local language-model workloads.
No data in the available reporting establishes a direct causal link between local AI demand and this price move. The quote is not an NVIDIA announcement, names no retailer or sampling time, and does not represent Chinese e-commerce or secondary-market pricing; US$610 was described as “roughly RMB 4,000-plus”, an approximate conversion supplied by the source and not independently checked. Treat it as a localised retail observation, not a market price index.
Sources
Original report
- Shande Zixun / 0101SSD (Chinese storage-industry outlet) — November 11, 2026: https://mp.weixin.qq.com/s/NCoix70P5VOf106fC8H62w
Company and research-house releases
- ASML — “ASML reports €11.7 billion total net sales and €5.0 billion net income in Q3 2026”, October 14, 2026: https://investor.asml.com/news-releases/news-release-details/asml-reports-eu11.7-billion-total-net-sales-and-eu5.0-billion-net-income-q3-2026
- ASML — “ASML reports €9.3 billion total net sales and €2.9 billion net income in Q2 2026”: https://www.asml.com/en/news/press-releases/2026/q2-2026-financial-results
- Furukawa Electric — “Expansion of Supply Capacity for HVLP 4 Copper Foil Used in High-Frequency Circuit Boards for AI Servers”, November 9, 2026: https://www.furukawaelectric.com/en/release/2026/comp_20261109.html
- TrendForce — “Persistently High DRAM Prices Drive Adoption of Reballed Memory, with Smartphone Penetration Expected to Reach 7–9% in 2027”, November 6, 2026: https://www.trendforce.com/presscenter/news/20261106-13297.html
Independent reporting
- TrendForce News — “Samsung, SK hynix Reportedly Race for ASML EUV Amid 2027–2028 Shortages; Orders Worth Up to KRW 20T Each”, November 10, 2026: https://www.trendforce.com/news/2026/11/10/news-samsung-sk-hynix-reportedly-race-for-asml-euv-amid-2027-2028-shortages-orders-worth-up-to-krw-20t-each/
- The Register — “Memory crunch makes refurbished kit look a lot less secondhand”, November 9, 2026: https://www.theregister.com/on-prem/2026/11/09/memory-crunch-makes-refurbished-kit-look-a-lot-less-secondhand/5307758
- Computer Weekly — Canalys Channel Forum coverage, including the Omdia quotation: https://www.computerweekly.com/microscope/news/366651811/Canalys-Channel-Forum-Now-is-the-moment-for-circular-computing
- Futurum Group — “Google Adds TPU 8tx and 8i Max as TPU Customers Approach 100”, November 9, 2026: https://futurumgroup.com/insights/google-adds-tpu-8tx-and-8i-max-as-tpu-customers-approach-100/
- GameGPU — “Prices GeForce RTX 3060 12GB jumps to $610 due to supply shortage”: https://en.gamegpu.com/news/zhelezo/tseny-na-geforce-rtx-3060-12-gb-podskochili-do-usd610-iz-za-nekhvatki-postavok
FAQ
Q: What does Omdia’s 35% forecast actually measure?
A: At the Canalys Forums, Omdia senior analyst Ben Caddy predicted that by 2030, 35% of all hardware sold through the EMEA channel will be taken back by partners and the ITAD companies they work with, according to Computer Weekly and The Register. It is a take-back rate for EMEA channel hardware, not the share of hardware sold that is refurbished. Caddy attributed it to the economics of recovering value and extending IT lifecycles; The Register reports that suppliers cite availability of returned devices and buyer trust as the main constraints.
Q: What did ASML actually say about 2027 and 2028 supply?
A: In its Q3 2026 results, ASML said supply as currently planned for both years “will not fully meet the demand of our customers” and that some customers are inquiring about 2029 and 2030 orders. Its Q2 2026 release said it plans a 30% increase in 2027 low-NA EUV capacity from a 2026 base of around 65 units, and was investigating a further 30% for 2028; the Q3 release says ASML is now investigating 2028 capacity beyond that 30%. The 2028 increase is under review, not committed.
Q: What does TrendForce’s 7–9% figure measure?
A: It is the estimated penetration of reballed memory in the smartphone market in 2027, up from about 3–4% in 2026 — not a share of mobile DRAM bit shipments. TrendForce says supply is concentrated in 4GB LPDDR4X parts used mainly in 4G phones below CNY 1,299, and that the practice’s share of total smartphone LPDRAM bit consumption will remain modest. It also flags quality-consistency, device-lifespan and warranty-cost risks.
Q: When will Furukawa Electric’s new copper foil capacity arrive?
A: The company’s November 9 release says supply capacity for F0X-WS (HVLP4) foil will reach approximately twice the end-FY2026 level by the end of FY2029, through a phased expansion at its Japanese site and two group subsidiaries in Yunlin County, Taiwan, China. No absolute tonnage, capex figure or interim milestone was disclosed, so the pace of the increase cannot be quantified from the release.
Provenance
- Source: Shande Zixun / 0101SSD; ASML; Furukawa Electric; TrendForce; TrendForce News; The Register; Computer Weekly; Futurum Group; GameGPU - multi-source roundup. Full citation list in the Sources section above.
- Collection date: 2026-11-11
- Measurement window: Cross-vendor industry roundup published 11 November 2026; underlying disclosures and reports span 14 October to 10 November 2026 (ASML Q2 and Q3 2026 results, Furukawa Electric 9 November release, TrendForce 6 November release, Google Cloud 9 November webcast coverage)
Trade quotes on this site are not equal to global transaction prices. How we source this →